GWS - A new look at the GWS site during the install of the Intertie System. The building to the left appeared since our last visit.
|
|
|
|
GWS - Some of the crew that day seeing the site for the first time.
|
|
|
|
GWS - The tower at the site. No antennas other than a DB420 at the top as we deploy at this time a repeater for the site.
|
|
|
|
GWS - Weather station antenna.
|
|
|
|
|
GWS - Tower lights mid point.
|
|
|
|
GWS - Yagis for another system at the site.
|
|
|
|
GWS - A four-bay looking at Odem site for linking to the Intertie System.
|
|
|
|
GWS - The candleopera with our DB-420 vertical used for the repeater.
|
|
|
|
|
GWS - Mike, KD5FVZ, talking over the site with the crew. Mike is the site's manager for the Intertie System.
|
|
|
|
GWS - Surveying the air conditioner which needs our attention. Repairs to be done shortly.
|
|
|
|
GWS - Bob, WA5JYJ, pays a visit to the site with his XYL to see it the remodeling taking place.
|
|
|
|
GWS - A few of the crew taking a look at the other systems already in service at the site.
|
|
|
|
|
GWS - Attaching the grounding system the the cabinets.
|
|
|
|
GWS - Checking out the air conditioning system.
|
|
|
|
GWS - Adding to the grounding system existing and attaching it the the existing equipment at the site.
|
|
|
|
GWS - Releveling and straightening the air conditioning system on its concrete slab.
|
|
|
|
|
GWS - Checking and tightening the grounding system to the outside generator.
|
|
|
|
GWS - Reconnecting the outside grounding rod with the ground system wiring. One of several ground rods around the building.
|
|
|
|
GWS - Moving the air conditioning unit to correct its plumbing and electrical fittings from being in a bind.
|
|
|
|
GWS - Again, leveling the air conditioning unit on its concrete slab due to weathering.
|
|
|
|
|
GWS - A little leverage was needed to accomplish this task while the others slide the unit in place.
|
|
|
|
GWS - After leveling the air conditioning unit we all stepped back to check it again.
|
|
|