Pleasanton (PLZ) Photo Gallery                                     Home / Site Photo Gallery

PLZ - Interconnections between the meter box and breaker box at our Pleasanton Site.

PLZ - Another view of the breaker to meter box connections.

PLZ - Larry, W5EX, making connections to the meter box for site power.

PLZ - Reattaching the meter box cover before leaving the site with all power issues resolved.

 

PLZ - Our Newest Site which will allow us another path to Corpus Christi and fill in I37 Evavuation route. This site will be coming online real soon. Last weekend by the Crew of KD5ZSY, Stan, and W5EX, Larry the electrical breaker box was installed and wired to the meter box. The previous weekend one antenna and two hard-line runs were deployed by KD5FVZ, Mike, NU5P, Benny(on the tower), W3DH,Dave, and assistant, Ben, and N5HN, Jim (on the rope pull). On the AC power connections and work over was David, WD5IEH and Walter, WB5FNZ. More on this site soon.

Revised by N5VRP, Dennis Rogers, Webmaster
Copyright 2006 by Intertie, Inc. All Rights Reserved
No use of symbols or phrases is allowed without the express written permission of Intertie, Inc.